Locker Proposal Gentlemen, just a short follow on from my last report and explanation of our intentions regarding the further development and refurbishment of our locker room, which you have probably noticed and really can’t have missed over the past few days. By the time this newsletter hits our website it is hoped that the second batch of lockers will have been manufactured and even being installed possibly, and with the remaining raised floor area in the throes of re-decoration and carpeting. We have had a slight re-think on the raised floor area of the locker room in so much that, at present we are going to review the arrangement proposals because of aesthetics and considering combining that area with a bank of lockers that will replace all those narrow metal lockers that are sited behind the “Pro” shop that aren’t really suitable to take modern equipment. More members are adding their names to the growing list which is in the hands of Greg in the “Pro” shop, and as a response, we are proposing to progress with further replacements to further enhance the locker room practicality and appearance. The present phase is slightly over subscribed so we are doing our best to appease those members who have pre-paid into the scheme and hope that you will accept our apologies if anyone has been disappointed or disrupted by our enabling arrangements. Having spoken to our cabinet manufacturer and installer it would appear that the next phase of lockers to include those previously mentioned, will be fitted at the end of February or thereabouts and certainly before the playing season, so if you wish to be added to the list please enquire through Greg. Many Thanks for your interest. TE/ Steering Group
Winter Rules Winter Rules 2017/2018.
Preferred Lies will operate from Friday 13th October 2017.
Placing on fairways. Dropping in the rough.
See main noticeboard for full details of the actual rules.
|